Home
Products
Technical Index
 
Customer services
 
View Your Order
Express Order Page
 
Branch locator
Delivery
 
Help
Whats new
Special offers

Technical Specifications

A TYPICAL INSTALLATION FOR A POWER SHOWER
 

Power Shower

Site Requirements - Electrical

The pump must be permanently connected to the electricity supply via a double pole isolating switch with a minimum contact gap of 3mm in both poles. The switch must be readily accessible but out of reach of a person using a fixed bath or shower, except for the cord of a pull cord operated switch. The wiring must be connected to the switch without the use of a plug or socket outlet. The supply cable selected for installation must conform to the relevant table in the I.E.E. regulations. To enhance electrical safety a 30mA RCD (Residual Current Device) should be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.

This Installation Must Be Earthed

Site Requirements - Water

To ensure correct operation the pump must be connected to a cistern fed supply of hot and cold water at nominally equal pressures. The pump must never be connected to the mains cold water supply. The cold water cistern must always be above the pump to ensure priming of the unit (see diagrams for details). The hot water storage cylinder and cold water cistern should each have a minimum storage capacity of 114 litres in order to ensure adequate infill rate. If supplying a number of outlets, it is recommended that the cold water cistern should have a minimum capacity of 230 litres in order to ensure adequate infill rate. Both hot and cold water supplies to the pump must be dedicated and separate from any other outlets or connections.

Water Connections

Mixer Valve Inlet Connections:

  • 15mm compression fittings on hot and cold inlets
  • Rising, falling and rear entry water supplies via swivel inlet elbows
  • Distance between centres of inlet elbows: Minimum 146mm Maximum 160mm
  • Integral check valves prevent back flow into hot and cold water supplies

Mixer Valve Outlet Connections:

  • Threaded 1/2" BSP top and bottom (one blanked)
  • The mixer valve is supplied with an adaptor which provides either 15mm compression or 1/2" BSP for the hose fitting. Minimum 146mm Maximum 160mm
  • Integral check valves prevent back flow into hot and cold water supplies

Mixer Valve Outlet Connections:

  • Threaded 1/2" BSP top and bottom (one blanked)
  • The mixer valve is supplied with an adaptor which provides either 15mm compression or 1/2" BSP for the hose fitting.

Pump Water Connections:

  • 4 flexible connectors with 15mm push-in fittings

Pump Motor Specification

  • Twin impeller pump
  • Rating - 50Hz, 240V, 590W, single phase, recommended duty cycle 15 minutes on, 45 minutes off
  • Automatic resetting thermal overload cut-out
  • Flow Rate : up to 16 litres per minute
  • Pressure : Maximum pressure at maximum flow 1.2 bar equivalent to a 12.6m head of water
  • Variable speed control : 100% to 50% of performance

Materials of Construction

Mixer Valve Brass inlet elbows and body, ABS trim, engineering polymers for thermostat cartridge.

Pump WRC approved materials which are inherently limescale resistant.

Dimensions (mm)   Height Width Depth
Power Shower Packs : Flush Fit Valve 165 165 64
  Surface Mount Valve 110 218 126
  Pump 141 242 97

Product Approval

Designed to comply with Water Fitting Bye-Laws Scheme operated by The Water Research Centre

Power Shower Packs and AS2000T only: thermostatic performance designed to conform to British Standards

Designed to comply with the latest product electrical safety standards

Company Approval

Triton is registered by The British Standards Institute and all Triton products are designed, tested and manufactured under Quality Management Systems certified to BS EN ISO 9001 : 1994 and Environmental Management Systems approved to ISO 14001.

Guarantee

All in one power showers and power shower pack pumps are covered by a 12 month guarantee (power shower pack mixer valve has 3 year guarantee) from the date of purchase. For a small premium this can be extended to 3 to 5 years (for full details please see the warranty application form included in every Triton shower pack).

Installation

Installation should be carried out by competent tradesmen in accordance with the detailed fitting instructions (supplied with every unit) and Water Regulations and Bye-Laws. A copy of the fitting instructions is available on request from the Customer Service Department if it would help when planning your installation.

Trade Installer Hotline

Trade installers can phone a dedicated hotline on 024 7632 5491 for immediate technical advice on installation, and to ensure product suitability for commercial and multiple installations.