8.3.2 - Correct testing sequence

Some tests will be carried out before the supply is connected, whilst others cannot be performed until the installation is energised. {Table 8.5} shows the correct sequence of testing to reduce the possibility of accidents to the minimum.

Table 8.5 - Correct sequence for safe testing
BEFORE CONNECTION OF THE SUPPLY
1
Continuity of protective conductors
2
Main and supplementary bonding continuity
3
Continuity of ring final circuit conductors
4
Insulation resistance
5
Site applied insulation
6
Protection by separation
7
Protection by barriers and enclosures
8
Insulation of non-conducting floors and walls
9
Polarity
10
Earth electrode resistance if an earth electrode resistance tester is used
WITH THE SUPPLY CONNECTED
11
Earth electrode resistance if an earth-fault loop tester or the ammeter and voltmeter method are used
12
Confirm correct polarity
13
Earth-fault loop impedance
14
Correct operation of residual current devices
15
Correct operation of switches and isolators

 

 